Plant Modifications

Food Service / Food Packaging Inspection and
Recommendations for Plant Modifications

Food Service / Food Packaging Inspection and

A food service / food packaging company and RMA worked together to identify structural deficiencies and recommendations for the client's roll pad buildings to determine their projected building life. RMA performed an extensive inspection process of the buildings inspecting the post and beam frame systems and the bar joists supporting the roof decking. The inspection report included the general descriptions of the buildings, the inspection process along with conclusions and recommendations. The recommendations included structural integrity repairs considered essential to be accomplished in the near time frame. The remaining items were considered essential to extend the buildings life 10 years or more.

 

Beverage Manufacturer Plant Modifications
For a Design/Build pH Balance System

Beverage Manufacturer Plant Modifications

A beverage manufacturer and RMA worked together to perform upgrades with the installation of a pH balance system. RMA's services included performing a site visit of the facility and meeting with the staff to better understand the facility's needs, budget and schedule requirements. RMA performed a design build project that exceeded these requirements with the installation of a new pH balance system. The system components included a 10,000 gallon polyethylene tank, mixer, probes, caustic pumps and metering system, secondary containment and a PLC operating system. RMA services also included preparing the operation and maintenance manuals, functionality testing for all equipment, start-up operations of the equipment and staff training.