City of Lula - Wastewater Treatment Plant , Hall County, Georgia

 

The City of Lula and RMA worked together on the design, permitting and construction administration services for the City's new wastewater treatment facility sized for an average daily flow (ADF) of 0.375 million gallons per day (MGD), with the following plant operations:

  • Influent Pump Station
  • Influent Fine Screening
  • Grit Removal System
  • Sequencing Batch Reactor Basins
  • Flow Equalization Basin
  • Tertiary Treatment Process
  • Aerobic Digester
  • Ultraviolet Disinfection System
  • Effluent Cascade Step Aerator
  • Aerobic Digestion
  • Sludge Management (Belt Press)
  • Plant SCADA System
  • Chemical Storage Facility
  • Control/Maintenance Facility

RMA assisted the City with obtaining AARA and SRF funding ($8.6 million) to cover the entire project costs. ARRA grant funding received ($6.0 million) covered 70% of the total project construction cost.

 

Project Services Provided:

  • Preliminary Engineering Report
  • Design Development Report
  • Environmental Information Doc.
  • Funding Programs Apps./Assist.
  • Survey Services
  • Treatment/Process Calculations
  • Design Services
  • Cost Estimating
  • Permitting Services
  • Watershed Protection Plan
  • Bidding Assistance
  • Post Bid - Value Engineering
  • Construction Administration
  • Construction Observation
  • Project Certification
  • Project O&M Manual
  • State Sales Tax Reimbursement