Rindt-McDuff Associates
Services Markets About Us Careers Contact Us News
   Home    Services    Environmental & Safety   Water, Wastewater, Stormwater     Industrial Stormwater / SWP3

Construction Stormwater
Permit Services

Ground Water Modeling
Industrial Stormwater / SWP3
Under Ground Storage Tanks
SPCC Compliance

TRI Form R Reporting
Industrial Stormwater / SWP3

The NPDES general permit for stormwater discharges associated with industrial activity became effective August 1, 2006. RMA is equipped to assist industrial clients meet the new requirements.

WHAT’S DIFFERENT IN THE NEW PERMIT?


Facilities with discharges to Impaired Stream Segments, listed on the Georgia 303(d) list are required to develop, implement, and maintain their Storm Water Pollution Prevention Plan (SWP3) to be consistent with the TMDL, and are subject to additional sampling requirements.

Annual non-storm water discharge certification is required.

Authorization of discharges composed of uncontaminated compressor condensate.

Numeric effluent limitations for storm water discharges

Applicable EPCRA Section 313 water priority chemicals must be identified in the SWP3

Revised annual sampling requirements

New sampling parameters

Identify all potential industrial sources of fecal coliform that may be exposed to storm
water in the SWP3